pan of boiling water, hold pads with mole grips etc in water for 5-10 mins to soften glue/backing (don't let them touch the bottom can sometimes melt pad material) then clamp pad material in vice and remove backing.
Only took two weeks to build
Will get better pics tomorrow when out riding
Spec
Ozonys Skill 24 Frame
Echo urban forks
Echo tr front wheel
Hope pro 4 on Onza rear rim
Rockman high riser
05 Rear maggy Tnn Lgm
04 Front maggy Tnn Adm
Adamant cranks Echo bash
Kenda Kenetic 24x2.35 rear
Continental 24x2.10
Rockman Bottom bracket
Trialtech Pedals
Bonz 150x35
Rockman Foam grips
Echo clamps rear - Tnn Front
French ID headset